Follett LLC MCC425WBS Maestro Plus™ Chewblet® Ice Machine

SKU #: MCC425WBS
Description
Maestro Plus™ Chewblet® Ice Machine, with RIDE® remote ice delivery equipment, water-cooled self-contained condenser, for automatically filling ice storage bins, up to 425 lb production of Chewblet ice in 24 hours, requires adapter kit (sold separately), 220v/60/1-ph (model not for use in the United States)
Options
Reviews

There are no reviews yet for this product.

Limited or No Stock
?
Retail Price
$6,570.68 / each
Retail Price:
$6,570.68
$6,570.68 / each
?
Follett
Specifications
Type of CoolingWater-Cooled
24 Hr Production400-500 lbs
Type of IceNugget
BrandFollett LLC
Refrigerant TypeR-404A
Voltage220 Volts
Width (in)18.80
Height (in)17.10
Depth (in)20.75
Weight131.00
Description Options Reviews